• 2023 ProductReview.com.au Best Plumbers & Home Care Store
  • 2024 ProductReview.com.au Best Plumbers & Home Care Store
  • 2025 ProductReview.com.au Best Plumbers & Home Care Store

Please Install My New Electric Hot Water System

Was $800.00, Now $750.00 Special!
Choose Your Installation Speed
  • In stock, ready to ship
  • Backordered, shipping soon
โœ… Professional Installation | ๐Ÿ”ฅ Energy Efficient | ๐Ÿ“ฆ Fast Delivery
Price
Regular price $750.00
Regular price $800.00 Sale price $750.00
Save $50
/
WE INSTALL WHAT YOU BUY

Electric Storage Hot Water System Installation โ€“ Labour Only

This installation package covers the professional labour required to replace your existing electric storage hot water system with your purchased replacement cylinder, subject to the plumbing, electrical supply, installation location and access meeting the standard package requirements.

The standard service is based on a ground-floor external replacement in the same general location. Required valves, additional fittings, extra pipework, electrical alterations, support bases and other upgrade items are purchased separately where needed.

Where the existing electrical connection remains suitable for the new electric storage water heater, applicable disconnect and reconnect can form part of the installation. If the circuit rating, wiring, connection type or cable route needs to change, the relevant electrical upgrade must be purchased separately.

If a matching valve kit is added to the order, the package includes up to 2 metres of associated pipework installed as part of fitting the purchased valve kit.

Quick answer: this is a labour-focused electric storage replacement package. We install your purchased cylinder and purchased accessories, connect it to suitable existing plumbing, complete applicable like-for-like electrical disconnect and reconnect, remove the old cylinder from its installed position and complete the applicable plumbing compliance process. New circuits, rewiring, connection conversions, relocation, difficult access, disposal and other non-standard work remain separate.
WHAT'S INCLUDED

What Is Included in the Electric Storage Installation?

Electric Storage Installation Labour

Professional installation of your purchased electric storage water heater in the approved external ground-floor replacement position.

Purchased Accessories Fitted

Purchased valve kits and approved hot-water accessories are fitted where they form part of the selected installation scope.

Like-for-Like Electrical Reconnection

Applicable electrical disconnect and reconnect can be completed where the replacement uses a suitable existing connection and the work falls within the authorised licence scope of the attending trade.

Element Fitment

Where an approved non-standard heating element is required for the purchased cylinder, it can be supplied and fitted as part of the installation without an additional element-fitment labour charge.

Old Unit Removed From Position

The existing cylinder is disconnected and removed from its installed position. Off-site recycling or disposal is separate unless specifically included in the order.

Compliance Process

The applicable QBCC notifiable-work process and electrical testing or certification requirements are completed for the work actually performed.

VALVE KIT PIPEWORK

What Is Included When You Purchase a Valve Kit?

Where the matching valve kit is purchased with the installation, the installer fits the purchased valves and includes up to 2 metres of associated pipework installed.

This can accommodate ordinary connection differences between the old and new cylinders and provides a defined allowance for fitting the purchased valve arrangement.

The 2m allowance is not a relocation allowance. Major rerouting, long pipe runs, concealed plumbing work and moving the cylinder to another area remain outside the standard package.
STANDARD REPLACEMENT

What Counts as a Standard Electric Storage Replacement?

The standard installation is based on replacing an existing electric storage water heater with another suitable electric storage water heater in the same general external location.

  • Electric storage replaced with electric storage
  • Same general ground-floor external location
  • Suitable existing hot and cold water services
  • Suitable existing electrical circuit
  • Compatible electrical connection type
  • Existing cable reaches the replacement connection point
  • Suitable stable support base
  • Required drainage is available
  • Manufacturer clearances can be achieved
  • Safe and reasonably clear access
  • No major plumbing relocation required
  • No new circuit or rewiring required
WHAT'S NOT INCLUDED

What Is Outside the Standard Installation Package?

Materials Not Purchased

  • Valve kits
  • Additional fittings
  • Additional pipework outside the included allowance
  • Pressure-control components
  • Temperature-control components
  • New support base where required

Electrical Upgrades

  • New dedicated circuits
  • Circuit extensions
  • Rewiring
  • Connection-type conversions
  • Switchboard modifications
  • Repairs to defective existing wiring

Plumbing Alterations

  • Major relocation
  • Long new pipe runs
  • Major drainage alteration
  • Extensive rerouting
  • Repair of unrelated plumbing defects
  • Non-standard building modifications

Access & Other Site Work

  • Difficult access unless purchased
  • Stairs and significant steps
  • Special lifting requirements
  • Concrete cutting
  • Excavation
  • Specialist access equipment
ELECTRICAL DISCONNECT & RECONNECT

When Is Electrical Disconnect and Reconnect Included?

The standard package can include applicable disconnect and reconnect where the existing electrical arrangement remains suitable for the new electric storage water heater.

This generally means the replacement appliance uses an electrical arrangement compatible with the existing circuit, cable and connection point.

The existing wiring must also reach the new appliance's required electrical termination point when the cylinder is installed in its correct orientation.

Disconnect and reconnect does not include modifying the electrical installation. Extending wiring, changing circuit capacity, installing a new circuit, altering the switchboard or changing the connection arrangement requires the applicable electrical package.
RESTRICTED ELECTRICAL WORK

Can a Restricted Electrical Licence Cover the Reconnection?

Queensland restricted electrical work licences can authorise specific electrical work that is incidental to another trade, including certain work performed by plumbers working on hot water systems.

The licence holder can only perform the electrical work expressly authorised by the restrictions and conditions on that individual licence.

Where the replacement only requires authorised equipment disconnect and reconnect, that work may be completed within the relevant restricted licence scope.

Where the job requires electrical installation alterations beyond that scope, an appropriately licensed electrician is required.

WHEN ELECTRICAL WORK IS ADDITIONAL

When Do You Need an Electrical Upgrade Package?

Additional electrical work is required whenever the replacement cannot use the existing electrical arrangement without alteration.

  • Existing circuit capacity is inadequate
  • The replacement requires a different circuit rating
  • The existing cable is too short
  • The existing cable is unsuitable for the new load
  • A new circuit is required
  • A circuit extension is required
  • The electrical connection type changes
  • The system type changes
  • The existing wiring is damaged or defective
  • Switchboard work is required
The electrical requirements of the new appliance take priority. A replacement should not be connected to an existing circuit solely because the old cylinder operated from it.
ELEMENT CHANGES

What If the New Cylinder Requires a Different Heating Element?

Some electric storage cylinders are available with different heating-element configurations.

Where an approved non-standard element is required for the purchased system, Installed Today can supply and fit the required element as part of the installation without an additional element-fitment labour charge.

The selected element must still be compatible with the water heater and the property's electrical supply.

A different element can change the electrical load. If the required element exceeds the capacity of the existing circuit or wiring, additional electrical work is required before the cylinder can be connected.
ELECTRICAL TESTING

Is the Electrical Work Tested?

Yes. Electrical work performed as part of the installation must be tested as required before the affected equipment or installation is placed back into service.

The applicable electrical contractor or licensed electrical worker provides the required electrical testing documentation for the work performed under the relevant electrical contractor licence.

Depending on whether the work affects electrical equipment or the fixed electrical installation, the applicable Queensland electrical certificate may differ.

SYSTEM CONVERSIONS

What If You Are Changing Hot Water System Type?

Changing technology is not treated as a straightforward electric-storage like-for-like electrical replacement.

Existing System Replacement System Typical Additional Work
Electric Storage Electric Storage Standard package can apply where circuit, connection and location remain suitable
Heat Pump Electric Storage Electrical extension, conversion or other circuit work may be required
Electric Storage Heat Pump Use the heat-pump installation pathway; electrical conversion may also be required
Gas Storage Electric Storage New suitable electrical circuit may be required
Continuous Flow Gas Electric Storage New electrical circuit, support base and plumbing changes may be required

The exact electrical scope depends on the replacement appliance's specified load and connection requirements together with the existing site conditions.

BASE REQUIREMENTS

Does an Electric Storage Cylinder Need a Suitable Base?

Yes. The replacement water heater needs a stable, level and suitable support surface capable of carrying its filled operating weight.

An existing base can be reused where it remains suitable for the new cylinder and installation arrangement.

If the current location does not have an appropriate base, the required support-base option must be purchased or prepared before installation.

DRAINAGE

What Drainage Is Required?

The replacement installation needs suitable drainage for the relief valves and any other discharge points required by the final plumbing arrangement.

Depending on the installation, this can include:

  • Pressure and temperature relief-valve discharge
  • Expansion-control-valve discharge where fitted
  • Safe-tray drainage where required

The drainage must terminate at an appropriate approved discharge point for the actual installation.

The standard package assumes a suitable drainage pathway is available. If the existing drainage is missing, damaged, incorrectly located or cannot be reused, additional drainage work may be required.
VALVES & WATER PRESSURE

Can the Existing Valves Be Reused?

Existing hot-water valves can only be reused where they remain serviceable, compatible with the replacement cylinder and suitable for the actual water pressure and installation.

Depending on the installation, relevant components can include:

  • Cold-water isolation valve
  • Non-return arrangement
  • Pressure-limiting valve where required
  • Expansion control valve where required
  • Temperature-control device where required
  • PTR valve supplied for the new water heater

If existing valves are seized, leaking, damaged, incorrectly rated or otherwise unsuitable, the relevant valve kit or replacement component needs to be purchased.

Not every property requires every valve in the same configuration. The final arrangement depends on the water heater, incoming pressure and existing plumbing.
TEMPERATURE CONTROL

Does the Installation Need a Tempering Valve?

The completed installation must provide the required temperature control at outlets where temperature limitation applies.

An existing compliant temperature-control device can potentially remain where it is serviceable and suitable for the new installation.

If the existing arrangement cannot provide the required temperature control, a new appropriate device must be included in the installation scope.

QBCC FORM 4

Is a QBCC Form 4 Included?

In Queensland, installing or replacing a water heater in an existing building is generally classified as notifiable plumbing work.

Where the completed installation falls within that category, the licensed plumber registers the work with the QBCC using the applicable Form 4 process.

For the standard Installed Today package, the applicable Form 4 registration process and relevant lodgement fee are included where required for the installation completed.

Where additional categories of notifiable work are completed as part of the same job, the plumber records the applicable categories in the registration process.

EXTERNAL INSTALLATION

Where Can the Standard Electric Storage Package Be Installed?

The standard Installed Today package is based on a ground-floor position external to the building.

The installation area must allow the selected cylinder to be positioned, connected and serviced in accordance with its manufacturer requirements.

  • Ground-floor external position
  • Safe plumbing access
  • Suitable electrical access
  • Manufacturer service clearances
  • Suitable relief-valve drainage
  • Stable base
  • Safe route for cylinder handling

An internal installation is outside the standard package unless a suitable approved internal-installation scope has been purchased.

ACCESS REQUIREMENTS

What Access Is Included in Standard Installation?

The standard installation assumes the old and new water heaters can be accessed safely at ground level and the replacement cylinder can be manoeuvred from the delivery point to the installation position by one person using a suitable trolley.

The prepaid $300 two-person handling and difficult-access fee applies where additional labour is required because of conditions such as:

  • Stairs or significant steps
  • Steep driveways
  • Steep or uneven ground
  • Access through the interior of the building
  • Tight side access
  • Routes under approximately one metre wide
  • Additional lifting into position
  • Other difficult manual-handling conditions
If the replacement cylinder cannot be safely moved to the installation position by one person using a trolley, select the two-person handling add-on before installation.
OLD SYSTEM

Is Removal of the Old Electric Water Heater Included?

Yes. The installation labour includes disconnecting the existing water heater and removing it from its installed position.

Off-site disposal or recycling is separate. Select the applicable disposal service if you want the old cylinder taken away from the property.

WHEN INSTALLATION CANNOT PROCEED

What Happens If the Site Is Not Ready?

If the attending installer finds that the job cannot be completed within the purchased installation scope, additional work may need to be approved and purchased before installation can proceed.

Common examples include:

  • Existing circuit unsuitable for the replacement element
  • Electrical cable too short
  • Connection type needs changing
  • Defective existing electrical installation
  • Missing or defective valves
  • Unsuitable relief-valve drainage
  • No suitable support base
  • Major pipework changes required
  • Installation area unsuitable for the new cylinder
  • Difficult access not identified before attendance
Call-out charges may apply where attendance occurs but installation cannot proceed because the site falls outside the purchased package conditions. Check the installation position, electrical connection, valves, drainage and access before ordering.
CLEAR LABOUR-ONLY INSTALLATION SCOPE

We Install What You Buy

The electric storage installation package separates professional installation labour from the site-specific materials and upgrades that differ between properties.

If the property already has suitable valves, electrical supply, drainage and support, you are not automatically paying for unnecessary upgrades.

If something needs to be changed, the relevant valve kit, electrical package, base, disposal or other approved add-on can be selected so the installation scope is clear before attendance.

BEFORE BOOKING

What Should You Check Before Ordering?

  • The replacement is an electric storage water heater
  • The intended installation position is external and ground-floor
  • The replacement fits the existing location
  • A stable suitable base is available
  • The existing plumbing is serviceable
  • Required valves are serviceable or a valve kit has been added
  • Relief-valve drainage is suitable
  • The existing circuit is suitable for the new element load
  • The electrical connection type remains compatible
  • The existing cable reaches the new cylinder connection point
  • Any electrical alteration package has been added if required
  • Access allows normal one-person trolley movement
  • The $300 two-person fee has been added where difficult access applies
  • Old-system disposal has been selected if required

If you are unsure whether the property meets the standard conditions, send clear photos of the existing water heater, electrical connection, surrounding area and access route to help@installedtoday.com.au before ordering.

INSTALLATION AREAS

Electric Hot Water Installation in Brisbane & Gold Coast

Installed Today provides electric storage installation pathways across eligible Brisbane and Gold Coast service areas, subject to product availability, the selected installation package and the site's actual conditions.

Brisbane Gold Coast

Standard pricing assumes the external, ground-floor and access conditions described on this page. Electrical alterations, valve replacement, additional plumbing, drainage work, support bases, disposal and difficult-access services remain separate where required.

COMMON QUESTIONS

Questions About Electric Storage Hot Water Installation

Does This Package Include the New Water Heater?

No. This is the installation labour package. The electric storage water heater is purchased separately.

Are Valves Included?

No. Required valve kits and fittings are separate unless expressly included with another purchased product or package.

What If I Add the Valve Kit?

The purchased valve kit is installed and up to 2 metres of associated pipework is included under the valve-kit installation terms.

Is This Package for Electric Storage Systems?

Yes. This package is designed for electric storage hot water installation. Heat-pump systems use the separate heat-pump installation pathway.

Is Standard Installation External Only?

Yes. The standard Installed Today package assumes a ground-floor external installation position.

Can the New Cylinder Be Relocated?

Relocation is outside the standard scope and requires prior approval together with any additional plumbing and electrical work.

Does the Installation Include Electrical Reconnection?

Applicable disconnect and reconnect can be included where the existing circuit, wiring and connection remain suitable and the work is within the authorised licence scope of the attending trade.

Does It Include Rewiring?

No. Rewiring is additional electrical installation work.

Does It Include a New Circuit?

No. A new dedicated electrical circuit must be purchased separately where required.

What If the Existing Cable Is Too Short?

An electrical extension or conversion package is required. Extending fixed wiring is not standard disconnect and reconnect work.

What If the New Element Is Larger Than the Old One?

The existing electrical circuit must be confirmed suitable for the new load. If it is not, additional electrical work is required.

Can You Fit a Different Heating Element?

Where an approved non-standard element is required for the purchased cylinder, the element can be supplied and fitted as part of the installation without an additional element-fitment labour charge. Electrical compatibility still needs to be confirmed.

Can a Restricted Electrical Licence Cover Disconnect and Reconnect?

It can cover specific incidental electrical work where that work is expressly authorised by the licence. The exact scope depends on the restrictions and conditions on the individual licence.

What Electrical Work Requires an Electrician?

New circuits, circuit extensions, rewiring, switchboard alterations, connection changes and other installation work outside a restricted licence scope require the appropriate electrical licence.

Is the Electrical Work Tested?

Yes. Electrical work completed as part of the installation must undergo the applicable safety testing before the affected equipment or installation is returned to service.

Will Electrical Compliance Documentation Be Provided?

The applicable electrical certificate is provided for electrical work performed under the relevant electrical contractor licence.

Does the Installation Need a Base?

Yes. The new cylinder requires a stable and suitable support surface capable of carrying its filled operating weight.

Does the Installation Need Drainage?

Yes. Suitable drainage is required for the applicable relief valves and any other discharge arrangement required by the installation.

Can the Existing Valves Be Reused?

Only where they are serviceable, suitably rated and compatible with the new installation.

Is a Tempering Valve Always Required?

The installation must provide the required temperature-control arrangement. Whether an existing device can remain or a new device is required depends on the existing plumbing and replacement system.

Is QBCC Form 4 Included?

Where the installation is notifiable plumbing work, the applicable Form 4 registration process and relevant lodgement fee are included under the package terms.

Does Replacing an Electric Water Heater Normally Require Form 4?

Installing or replacing a water heater in an existing Queensland building is generally a category of notifiable plumbing work.

Can a Heat Pump Be Replaced With Electric Storage Under This Package?

The plumbing installation can be scoped for the conversion, but the electrical arrangement often differs and may require an electrical extension, conversion or other separately purchased work.

Can Gas Hot Water Be Replaced With Electric Storage?

Yes as a conversion project, but a suitable electrical circuit and additional plumbing work will generally be required where no compatible electric hot-water supply exists.

Is Old-System Removal Included?

Removal of the old water heater from its installed position is included.

Is Disposal Included?

No. Off-site recycling or disposal is a separate add-on unless expressly included in the order.

When Does the $300 Two-Person Fee Apply?

It applies where additional labour is required because the cylinder cannot be safely moved to the installation area by one person using a trolley, including stairs, steep access, restricted routes or additional lifting.

What Happens If the Installer Cannot Proceed?

Additional work may need to be purchased or the installation rescheduled. Applicable call-out charges may apply where attendance has occurred but the site falls outside the purchased installation conditions.

How Can I Check Before Booking?

Send photos of the current water heater, electrical connection, installation position and access route to help@installedtoday.com.au before ordering.

FINAL CHECK

Is This Electric Storage Installation Package Right for Your Job?

Choose this package where your purchased electric storage hot water system can be installed at a suitable external ground-floor position and the existing plumbing and electrical services are either compatible or the required upgrade packages have been added separately.

The standard labour scope includes professional installation, fitting purchased accessories, applicable like-for-like electrical disconnect and reconnect, connection to suitable existing plumbing, removal of the old unit from its installed position and the applicable Queensland plumbing compliance process.

Where a valve kit is purchased, up to 2 metres of associated pipework installed is included. Electrical alterations, new circuits, rewiring, relocation, additional drainage, new bases, difficult access and off-site disposal remain separate where required.

Before ordering, check the new cylinder's element load, electrical connection, installation position, valves, drainage, base and access so the correct installation package and add-ons are selected before attendance.

Experience the "Installed Today" Difference with Our Verified Installers

When you choose "Installed Today" for your installation needs, you're not just getting a product; you're gaining access to a network of rigorously verified installers dedicated to providing you with an exceptional service experience. Here's what you can expect when you opt for an installation by an "Installed Today" verified installer:

Professional and Efficient Service

  • Prompt Communication: Our verified installers will contact you within 2 business hours of receiving your order details to confirm and begin scheduling your installation at the earliest convenience.
  • Expert Installation: All "Installed Today" installers are highly skilled and qualified, ensuring your product is installed according to the highest industry standards and specific regulations in your area.
  • Clear and Professional Communication: From the moment they receive your order until the completion of your installation, our installers maintain clear and professional communication, providing you with all necessary information regarding your installation.

Peace of Mind

  • Insurance and Liability: Every "Installed Today" verified installer maintains comprehensive insurance coverage, giving you peace of mind knowing you're protected throughout the installation process.
  • Warranty and Quality Assurance: Enjoy a warranty on your installation, guaranteeing rectification work at no additional charge in the unlikely event of any deficiencies. Our installers strive to achieve a minimum 4.5-star average rating across major review platforms, reflecting our commitment to excellence and customer satisfaction.

Customer-Centric Policies

  • Customer Dispute Resolution: In the rare event of a dispute, our installers are committed to acknowledging and initiating the resolution process within 1 business day, aiming for a swift and satisfactory resolution within 5 business days.
  • Rectification Work Timeframes: Should any rectification work be necessary, it will be acknowledged within 1 business day and completed within 2 business days, ensuring minimal inconvenience to you.

Additional Services at Transparent Rates

  • Beyond Basic Installation: Our verified installers offer a range of additional services to complement your installation. All available services and their set rates are communicated upfront, ensuring no surprises.

By choosing "Installed Today," you're not just installing a product; you're investing in a seamless, quality service that values your time and peace of mind. Trust in our verified installers to exceed your expectations with their professionalism, expertise, and commitment to excellence.

This product description outlines the benefits and assurances provided by "Installed Today" verified installers, designed to inform and reassure customers about the high level of service they can expect.

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

Recently viewed